Alternate Futures

Alternate Clouds · Briefing for municipal government

AI infrastructure your residents' data never has to leave

Hardware-enforced isolation, controlled data routing, and a cost structure that does not charge you a premium for being a government. Prepared for city leadership in the State of Georgia.

Prepared by Alternate Futures July 2026 alternatefutures.ai
01

What the status quo costs

Local government is now the most expensive place in the economy to have a bad security day. Not because attacks are more sophisticated here, but because the recovery is slower, the services are essential, and the budget was never sized for it.

Atlanta, 2018Refused a $51,000 ransom. Courts, permits, and water billing offline for weeks. Figure combines spend to date with projected recovery and hardening.
~$17M
Baltimore, 2019Property transfers and billing frozen for roughly a month.
$18M+
Dallas, 2023Council-approved remediation. Fewer than 200 devices compromised; police, courts, and fire dispatch alerting affected.
$8.5M
Columbus, 2024Allocated through end of 2024, with further funds pledged since. Roughly half a million people's data exposed.
$7M
These are recovery, remediation, and hardening costs — not ransom demands. Where a figure includes projected spend, it is noted. In each case the ransom itself was immaterial next to the rebuild.

Sources: Atlanta · Baltimore · Dallas · Columbus · figures as reported at the time of each incident

The trend line is going the wrong way for you specifically

Straight talk

No infrastructure vendor can promise you will not be attacked, and we will not make that claim. What infrastructure can change is the blast radius: how much data is reachable from any one compromise, whether an AI workload can quietly ship resident records to a third party, and how fast you can prove to auditors and residents what was and was not exposed. That is what the rest of this document is about.

02

How we contain it

Three layers, each of which limits what the layer above it can reach.

Hardware-enforced isolation Available today

Workloads run inside confidential virtual machines built on Intel TDX. Memory is encrypted by the processor itself, so the host operating system, the hypervisor, and anyone else on that machine cannot read it. That includes us and it includes Phala Cloud, whose TEE hosts we deploy onto — neither of us can read enclave memory. Each deployment can produce a remote attestation report: a cryptographic statement, signed by a hardware root of trust, identifying exactly which code image was loaded into the enclave.

For an audit, that is the difference between "the vendor says the right software was running" and a signed hardware measurement you can verify independently.

Secure data filtering and routing On the roadmap

The failure mode we see most in government AI pilots is not a breach — it is a well-meaning department pasting resident records into a consumer AI service. Our AI gateway is designed to put a policy boundary in front of every model call: classify and redact sensitive fields (PII, PHI, criminal justice information) before a request leaves your boundary, route by classification so that regulated categories are pinned to enclave-backed or in-jurisdiction models and never reach a public endpoint, and log every decision as an auditable record.

The gateway and metering exist today across eleven model providers; the classification and routing policy layer is in development, and we would want a launch customer shaping it.

Knowing exactly where your data sits Available today

Every confidential deployment reports the specific TEE host and geographic region it landed on — recorded, surfaced in your dashboard, and available for audit. That is a stronger evidentiary position than a region label, because it identifies the actual machine.

We will be precise about the limit: on our confidential-compute provider today, we can report placement but not yet choose it — the provider allocates the host. Contractual placement control is roadmap work, and if guaranteed in-state or in-region residency is a hard requirement for your workload, tell us and we will scope it honestly rather than imply we have it. What is true today is that there is no architectural requirement for resident data to transit a hyperscaler.

What enclaves do and do not prove

Attestation proves identity: that genuine silicon is running firmware at a stated version, and that the image loaded hashes to a stated measurement. It does not prove that code is correct, bug-free, or well-behaved at runtime. And it is not a defense against an adversary with physical access to the host: the TEE.Fail research disclosed on 28 October 2025 used a DDR5 memory interposer costing under $1,000 to extract attestation signing keys from fully patched Intel TDX and AMD SEV-SNP systems — which means forged attestation reports are possible for an attacker who can get hands on the hardware. We would rather you hear the strong version of that from us than the weak version from a competitor.

03

Standards, stated precisely

Compliance language is routinely abused in this market, so here is the vocabulary we hold ourselves to. A certification is issued by an accredited body after audit. An attestation is an independent assessor's report. An authorization is a government body accepting risk and granting permission to operate. A self-assessment is a vendor's own assertion. They are not interchangeable, and we will not present one as another.

Our position as of July 2026. Roadmap items are commitments, not claims of current status.
FrameworkWhat it actually isWhere we stand
Intel TDX enclavesHardware capability protecting data in use; supports NIST SC-39 process isolation and argues toward SC-28(1)Live in production
GovRAMP
formerly StateRAMP, rebranded Feb 2025
Government authorization. The State of Georgia is a participating government; no Georgia city or county is currently listedOur primary authorization target
SOC 2 Type IIIndependent assessor attestationUnderway, targeted for late 2026
ISO/IEC 27001Certifiable ISMS standard, 3-year cycleRoadmap; architecture built to its control set
ISO/IEC 27017 & 27018Codes of practice — scoped into a 27001 audit, never certified standaloneTo be scoped into the 27001 program
ISO/IEC 42001The first and, today, the only certifiable AI management system standardRoadmap — the credential we think matters most for AI procurement
CJIS Security Policy v6.0No such thing as "CJIS certified" — compliance runs through your state CJIS Systems Agency — in Georgia, the GBI's Georgia Crime Information CenterArchitecture maps to it; agreement executed per agency
NIST SP 800-53 Rev 5 · AI RMFControl catalog and voluntary risk framework — neither is certifiableUsed as our internal control and AI-risk baseline
IRS Publication 1075Federal tax information — requires a FedRAMP-authorized provider at Moderate or aboveNot yet eligible. If your workload touches FTI, we will tell you so and stay out of it.

Two Georgia-specific notes. The Georgia Technology Authority builds its security standards on the NIST Risk Management Framework, NIST CSF, and CIS 18 — binding on state agencies and available to municipalities as guidance and shared services. And the State of Georgia is a participating GovRAMP government, which is why GovRAMP authorization is our first compliance investment rather than FedRAMP — though we would note that GovRAMP participation is currently at state level, and municipal procurement here generally is not yet gated on it.

Worth raising with your finance office

GTA administers Georgia's share of the federal State and Local Cybersecurity Grant Program, under which at least 80% of funds must benefit local governments and at least 25% must reach rural areas. Two caveats your grants officer will already know: the program's original appropriation ran through FY2025 and reauthorization is pending in Congress, and the local match rate rose across the program's life to 40% in FY2025. Worth confirming the current cycle before building a budget around it.

Separately, UGA's CyberArch program (Carl Vinson Institute of Government) provides no-cost cybersecurity assessments to Georgia local governments — a useful independent baseline before any procurement.

GTA Cybersecurity Grant Program · UGA CyberArch

04

What you are paying for the government label

Government cloud regions charge a premium over the identical commercial service. That premium is real, and it is not evenly distributed: compute runs roughly 26% higher, but storage and egress — the two lines that grow every year in a city — run up to 72% higher. All figures below are AWS list prices, pulled from the AWS Price List API on July 28, 2026, comparing us-gov-west-1 against us-east-1. Azure Government prices at a near-identical +26% on Linux compute, which suggests this is a market-wide compliance premium rather than one vendor's policy.

AWS list prices, us-gov-west-1 against us-east-1, retrieved July 28, 2026 from the AWS Price List API (EC2, S3, and Data Transfer catalogs). Human-readable equivalents: EC2 · S3 · GovCloud.
Line itemCommercialGovernment regionPremium
General-purpose compute, per hour
m5.large, Linux on-demand
$0.096$0.121+26%
Object storage, per GB-month
S3 Standard, first 50 TB
$0.023$0.039+70%
Outbound data transfer, per GB
first 10 TB to internet
$0.090$0.155+72%
Free egress allowance
per month
100 GBnonebilled from byte one
H100 GPU, per GPU-hour
p5.48xlarge, 8× H100
$6.88$8.26+20%

The same workload on Alternate Clouds

Customer-facing rates on the monthly plan, inclusive of our 25% usage margin (20% on an annual agreement). Platform access is $25 per seat per month, or $20 per seat annually.
Line itemAWS GovCloudAlternate Clouds
Confidential VM (Intel TDX), per hour
tdx.small through tdx.xlarge
no confidential-VM equivalent$0.07 – $0.58
Confidential GPU, per hour
NVIDIA H200, TEE-backed
not offeredquoted at proposal
Egress on compute$0.155/GBno surcharge
Egress on object storage$0.155/GBprovider cost, passed through

Two numbers to take to your budget conversation

The honest comparison

Two things to be straight about. Our confidential GPU offering is NVIDIA H200 today — H100-class confidential instances are not yet live on our platform, so we have not printed a headline GPU number we cannot honor; you will get a firm quote at proposal. And on compliance: we are not FedRAMP or GovRAMP authorized today. For workloads that require an authorized provider — anything touching federal tax information, and whatever your CJIS Systems Agency agreement specifies — that authorization is the binding constraint and no discount overcomes it. What we would propose is starting where it does not: internal document processing, permitting and licensing workflows, 311 and constituent services, GIS and public records. Those are real budget lines, and they are where a pilot can prove itself without putting a compliance obligation at risk.

05

What we would propose

A scoped pilot on one workload that does not carry a CJIS or FTI obligation, run against your existing cost baseline so the comparison is yours rather than ours. We would bring the enclave deployment and attestation verification; we would want your team's requirements shaping the data filtering and routing policy layer while it is still being built. If a GTA cyber assessment or grant cycle is in your calendar, that is a natural place to anchor the timing.

If it does not save money against your own numbers, there is no reason for you to proceed, and we would rather establish that in six weeks than six quarters.

Continue the conversation

Angela Steffens, Co-founder & CEO · angela@alternatefutures.ai